LKAB increases the capacity of its existing unloader at MK3 in Vitåfors. Larger volumes of trains with raw materials and additives must be able to be handled. NYAB is entrusted with carrying out earthworks, demolition and concrete work. The project will be completed in the autumn of 2019.
It is gratifying to sign the second contract in a short time with LKAB. The fact that LKAB is preparing for expanded capacities gives faith in the future, says Stefan Säthergren, production manager at NYAB.