Replacement of pipe bridge under E4 for. Traffic was diverted from one half of the road to the other during the work. The contract was completed in 30 of 45 days according to the contract.
2020
Execution contract
NLC Storuman Stage 2 - Triangular tracks
Terracing for a new railroad between the terminal and the inland track. The work includes shaft, filling, ducting, unloading and crushing.
2017-2019
Execution contract
HS-Magasin
Construction of deposition pond for highly sulfuric material. Includes shaft and fill of 1,700,000m³ of material.
2018-2019
Turnkey contract
PT33 Vaikijaur
Shafts, filling, concrete, ducting, maneuvering, fences for 130kV and 40kV switchgear.
2018-2019
Execution contract
Bridge over GC road
Construction of bypass for Riksväg 45 before the start of the bridge construction. Shaft of ground and rocks. Concrete works for a new bridge, refilling and reconstruction of the road. New railings and refuges on the road section affected by the construction. New walkway and cycle path under the new bridge and connection to existing roads on both sides of the E45.
2019
Execution contract
Fiber work
Sealing of existing fiber network within Domsjö-Vårby Strand. The work includes sewerage, fiber blowing, welding, customer installations, joints, termination etc.
2019
Collaboration contract
MOVING OF THE COURT AND JAIL
Relocation of the courthouse and old jail, including associated land and construction work
2019-2020
Execution contract
Opto 2.0 Harrträsk
The object refers to the placement of approximately 150,000 meters of multiduct in the ground, approximately 25,000 meters of existing cable trays in incl. placement of about 200 cabinets and blowing of micro cable along the railway on the following sections: Harrträsk - Kiruna C1 Gällivare - Koskoskulle Kojiuvaara - Aitik Råtsi - Svappavaara
2018
Execution contract
Mounting of fences
Installation of about 180,000 meters of fencing in Västernorrland, Västerbotten and Norrbotten County.