Construction of bypass for Riksväg 45 before the start of the bridge construction. Shaft of ground and rocks. Concrete works for a new bridge, refilling and reconstruction of the road. New railings and refuges on the road section affected by the construction. New walkway and cycle path under the new bridge and connection to existing roads on both sides of the E45.
Replacement of pipe bridge under E4 for. Traffic was diverted from one half of the road to the other during the work. The contract was completed in 30 of 45 days according to the contract.
2020
Execution contract
NLC Storuman Stage 2 - Triangular tracks
Terracing for a new railroad between the terminal and the inland track. The work includes shaft, filling, ducting, unloading and crushing.