Remodeling and extension of industrial premises with concrete frame, steel superstructure. Cladding and insulation of existing pellet silos - 2500 m2, extension locks for unloading at railway tracks
Replacement of pipe bridge under E4 for. Traffic was diverted from one half of the road to the other during the work. The contract was completed in 30 of 45 days according to the contract.
2020
Execution contract
NLC Storuman Stage 2 - Triangular tracks
Terracing for a new railroad between the terminal and the inland track. The work includes shaft, filling, ducting, unloading and crushing.