Basic maintenance of roads, snow plowing, ditch mowing, ropes and maintenance of roads, signage, railings, wire rails, snowstorms, rounding and inventory of maintenance needs. Call-out and on-call activities
Replacement of pipe bridge under E4 for. Traffic was diverted from one half of the road to the other during the work. The contract was completed in 30 of 45 days according to the contract.
2020
Execution contract
NLC Storuman Stage 2 - Triangular tracks
Terracing for a new railroad between the terminal and the inland track. The work includes shaft, filling, ducting, unloading and crushing.